BioPellKompakt

biopellkompakt
Bio-Pellkompakt
kolton-piec-na-pellet-biopellkompakt
kolton-piec-na-pellet-biopellkompakt-2
kolton-piec-na-pellet-biopellkompakt-4
kolton-piec-na-pellet-biopellkompakt-3
kolton-piec-na-pellet-biopellkompakt-5
kolton-piec-na-pellet-biopellkompakt-6
kropelka Hot water
Frame Heating

BioPellKompakt is a heating boiler containing a tubular heat exchanger based on a three-pass design adapted to burn pellets.

The boiler body is made entirely of boiler sheet metal. The advantage of the boiler is the placement of the pellet container above the heating exchanger, which allows for a reduction in the boiler’s dimensions and allows for installation even in the smallest boiler rooms.

Thanks to the tubular exchanger in the boiler, we obtain smokeless combustion and high efficiency. The boiler is equipped with a KIPI burner, the combustion chamber of which, by rotating, cleans the furnace of the resulting slag and ash, thanks to which the burner works efficiently all the time without a drop in power and does not get clogged.

The boiler is characterized by maintenance-free operation and the possibility of cleaning through a large front door. Advanced automation supports three pumps independently and the fuel ignition system, thanks to which the boiler service is reduced to the necessary minimum.

Ask for a product

Equipment

Standard

  • Pellet burner with rotating combustion chamber
  • Two ceramic igniters
  • Blower fan
  • K702 controller (control of three pumps independently, cooperation with room regulators, control of the mixing valve)

Optional

  • K902 controller (control of up to six pumps independently, control of mixing valves, built-in Wi-Fi module)

Characteristic

check icon

Automatic ignition and extinguishing

check icon

Innovative system for cleaning the furnace from the slag

check icon

Modern design and small dimensions of the boiler

check icon

Additional igniter

Jakość marki

Class 5 certificate and eco design (ecodesign)

Technical data

12 16 20 24

BioPellKompakt

Dust emission up to 20 mg/m³
YES
YES
YES
YES
Boiler heating surface
1,2 m²
1,6 m²
2,0 m²
2,4 m²
Nominal thermal power
12 kW
16 kW
20 kW
24 kW
Thermal efficiency – minimum/nominal power
91,47/ 92,38%
91,85/ 92,20%
91,05/ 92,31%
91,66/ 91,83%
Max. boiler water temp.
95°C
95°C
95°C
95°C
Maximum allowable boiler pressure
0,2 Mpa
0,2 Mpa
0,2 Mpa
0,2 Mpa
Required chimney draft
0,13 mbar
0,15 mbar
0,18 mbar
0,10- 0,25 mbar
Cross-section of the chimney opening
16 ⌀
16 ⌀
16 ⌀
16 ⌀
Hopper capacity
200 dm³
200 dm³
200 dm³
200 dm³
Water capacity in the boiler
100 dm³
110 dm³
140 dm³
140 dm³
Estimated building area to be heated
do 110 m²
do 160 m²
do 200 m²
do 240 m²
Boiler power supply
230/50 V/Hz
230/50 V/Hz
230/50 V/Hz
230/50 V/Hz
Fan power
140-180 W
140-180 W
140-180 W
140-180 W
Driver power
4 W
4 W
4 W
4 W
Primary fuel
Wood pellets
Wood pellets
Wood pellets
Wood pellets
Burner type
Kipi
Kipi
Kipi
Kipi

Due to continuous modernization, KOŁTON reserves the right to introduce changes to the technical parameters, equipment and specifications of the goods offered without prior notice. The content on the website is illustrative and may vary depending on the size and equipment of the central heating boiler. Sketches, photos and cross-sections reflect the appearance of the central heating boiler.

Dimensions

A – Flue diameter

B – Height from bottom to bottom of flue

C – Total length

E – Total width

G – Height

I – Inlet sleeve

J – Return sleeve

kolton-piec-na-pellet-biopellkompakt-wymiary

Dimensions

12 16 20 24

BioPellKompakt

A – Diameter of the flue
16 ⌀
16 ⌀
16 ⌀
16 ⌀
B – Height from bottom to bottom of the flue
54 cm
54 cm
54 cm
54 cm
I – Power supply sleeve
74,3 cm
74,3 cm
74,3 cm
74,3 cm
J – Sleeve back
25 cm
25 cm
25 cm
25 cm
C – Total length
124 cm
124 cm
139 cm
139 cm
E – Total width
66 cm
66 cm
66 cm
66 cm
G – Height
141 cm
141 cm
141 cm
141 cm
Weight
385 kg
400 kg
440 kg
460 kg

Due to continuous modernization, KOŁTON reserves the right to introduce changes to the technical parameters, equipment and specifications of the goods offered without prior notice. The content on the website is illustrative and may vary depending on the size and equipment of the central heating boiler. Sketches, photos and cross-sections reflect the appearance of the central heating boiler.

Ask about the product BioPellKompakt






    Inquiry sent!

    We will contact you as soon as possible.

    Boiler disposal after the period of use

    After the period of use, the boiler should be taken to the appropriate collection points for secondary raw materials due to the variety of materials it is made of. When dismantling the boiler, all precautions and safety measures should be observed.

    mężczyzna

    You don’t know how to choose the right solution?

    Specify your needs and we will choose a solution for your investment.

    Run the form